Overview
The DC Visualization module lets you:- View data center floor plans with rack positions
- Manage rack placement with drag-and-drop
- Inspect individual rack contents and layouts
- Add and configure racks directly from the visual interface
- View both front and back of rack equipment
Accessing DC Visualization
Navigate to Data Center visualization from the main menu to view your data center layout.Managing Your Data Center Layout
Finding and Viewing Racks
1
Select Data Center
From the DC Visualization page, select your data center from the dropdown.You’ll see all racks displayed on a grid representing the floor plan.
2
Locate Specific Racks
Racks are displayed with their names and positions on the grid.Click on any rack to open the detailed rack inspector view.
Edit Mode
Enter Edit mode to make changes to your data center layout:1
Enable Edit Mode
Click the Edit button in the top toolbar.
2
Modify Rack Positions
- Drag racks to new locations on the grid
- Rotate racks using the rotate button
- Rename racks by clicking the pencil icon
3
Save Changes
Click Save when you’re done to persist your changes.
Adding Multiple Racks
You can quickly add several racks at once:1
Enter Edit Mode
Click Edit to enable editing.
2
Add Racks
Click on empty grid positions with the “plus cursor” to add new racks.Each click creates a new rack at that position.
3
Configure Racks
Edit each rack individually:
- Set the rack name
- Configure orientation
- Adjust position if needed
4
Save All Changes
Click Save to create all the new racks.
Rack Inspector
The Rack Inspector provides a detailed view of individual rack contents.Opening the Rack Inspector
Click on any rack in the DC visualization to open the inspector view.Rack Inspector Features
Dual-Side View- View both front and back sides of the rack simultaneously
- See equipment orientation (front-mounted vs. back-mounted)
- Asset model and specifications
- Service environment information
- U position and slot allocation
- Quick links to asset details
- Color-coded assets by service or status
- Blade system slot visualization
- Empty U positions clearly marked
Editing Assets from Rack View
From the Rack Inspector:- Click Edit asset on any equipment
- The asset form opens with all details
- Make your changes
- Save to update the asset
Data Center Grid Configuration
Extending the Layout
To accommodate more racks:1
Go to Data Center Settings
Navigate to Data Center → Data Centers and select your data center.
2
Adjust Grid Size
Modify the grid dimensions:
- Columns - Number of horizontal positions
- Rows - Number of vertical positions
3
Save Configuration
Click Save to apply the new grid size.
Rack Configuration
Rack Properties
When configuring a rack, you can set:- Name - Unique rack identifier
- Server Room - The room where the rack is located
- Orientation - Direction the rack faces
- Column/Row Number - Grid position for visualization
- Accessories - Patch panels, organizers, etc.
Rack Position and Orientation
Position (U-Level)- Standard equipment: U position (1-42 typically)
- Back-mounted equipment: Position 0
- Blade servers: Use slot numbers for same U position
- Controls which direction the rack faces in the floor plan
- Affects cable management and access planning
Asset Visualization Features
Color Coding
Assets can be color-coded by:- Service environment
- Asset status
- Model category
- Custom tags
Blade System Visualization
For blade chassis:- Individual blade servers shown in separate slots
- All blades at the same U position
- Slot numbers displayed clearly
- Empty slots marked as available
Interactive Elements
- Hover - See quick asset information
- Click - Open detailed asset view
- Search - Find specific assets by barcode/name
Video Tutorial
Watch this video demonstration of the Rack Inspector:Common Workflows
Planning a New Installation
1
Check Available Space
Use the DC Visualization to identify racks with free U positions.
2
Reserve Position
Note the rack name and available U positions for your new equipment.
3
Add the Asset
Create the asset with the planned rack and position (see DCIM Guide).
4
Verify Placement
Return to DC Visualization to confirm the asset appears correctly.
Reorganizing Racks
1
Document Current State
Take note of current rack positions and equipment.
2
Enter Edit Mode
Enable editing in DC Visualization.
3
Move Racks
Drag racks to their new positions on the floor plan.
4
Update Labels
Rename racks if needed to reflect new naming conventions.
5
Save and Verify
Save changes and verify all equipment is correctly positioned.
Tips and Best Practices
Related Documentation
- DCIM - Managing data center assets
- Dashboards - Visualize asset data